After a long winter lay off work was restarted on the next stage of laying the foundations for the decking. The weather was very good so i was able to measure up the site, mark it out and create the post bases for the front section of decking. Click here for further information. The post bases for the decking at the side of the caravan were completed in October 2014. Over the 18th-20th April three post bases were completed. Another three bases are still to be completed and then the construction of the wooden frame can start. |