Background
In late 2015 my mother decided to reduce the amount of driving she did and purchased an electric scooter. It is more like a small electric car as it is fully enclosed,has windscreen wipers ,full road going lights and indicators. It even has it's own registration plate! She intends to use it to get around locally rather than use the car.
The manufacturer of the scooter recommends that it is stored in doors or under cover away from bad weather and direct strong sunlight. It is not possible to get the scooter around the back of the house so we have decided to build a drive in within the garden with a miniature car porch/canopy to protect the scooter. This will make it easy to get in and out and convenient to use. It does mean losing part of the garden but this simply means that we will have to re-think how it is planted and maintained and may even present a few opportunities to innovate!
The manufacturer of the scooter recommends that it is stored in doors or under cover away from bad weather and direct strong sunlight. It is not possible to get the scooter around the back of the house so we have decided to build a drive in within the garden with a miniature car porch/canopy to protect the scooter. This will make it easy to get in and out and convenient to use. It does mean losing part of the garden but this simply means that we will have to re-think how it is planted and maintained and may even present a few opportunities to innovate!
The rose bush was removed maintaining as much of the root structure as possible. The soil was then removed to lower the area to street level on the other side of the hedge. This meant removing around 18" of soil. The initial work was started in January 2016 in a short period of reasonable weather however this did not last long.
When the weather picked up in late spring the work restarted. More soil was removed and a section of hedge was removed. This was easier than expected as sometimes the root can be very deep and thick. The hedge was removed carefully to avoid damaging the remaining sections.
With these types of construction projects i never get a great deal of luck and this one was no different. As soon as i started digging the first foundation for the gate/canopy support i hit a metal spike. This was the remains of a metal fence that was cut down during the early stages of World War II to be recycled for the war effort! I thought it would take a long, long time to get out but in the end it was just under an hour, but a tough one at that!
This shows the upper part of what will be the driveway. Sadly the Hydrangea had to be removed however i advertised it and it went to a good new home. I was so pleased that i did not have to destroy it by cutting it down into bits. The root ball did put up a good fight before i was able to get it out.
|
The good top soil was piled onto the adjacent flower bed and will be re-used. The lower quality sub-soil was bagged up and will be taken for recycling if it cannot be re-used locally. The rose bush removed was planted into this raised area to try to save it for re-use later.
As the soil has been removed around the root area, these sections of hedge were watered and fed regularly to minimise the risk of damage. The fence was originally installed over 50 years ago and it is at least 30 years since most of it saw day light!
The garden would be a bit of a building site for most of the Spring and early Summer so i decided to use the current mound of surplus soil as a feature and store and develop plants here as it does get a lot of sun and there is shelter behind the hedge. This way the garden will still provide some enjoyment when looking out the window rather than looking out to a wet muddy patch....builders please take note! Here the second rose bush has been moved and small sections of the hedge have been kept for recycling.
The second rose bush also had to be removed. I have moved this to a temporary location and hope to re-use it or find a new home for it somewhere else. In this photograph the entrance area has been slightly widened, the approximate floor plan levelled and the first foundation hole dug. A small section of the lawn will have to be removed to create enough space for the scooter.
|
The same method of creating the concrete foundation for the metal post holder was used as when i built the decking at my mother's caravan. Plywood was used to create the sides to form the concrete. Wood offcuts were used to hold the sides together with screws. Because of the restricted space the wooden former shown above had to be modified to create the later post bases.
The slabs were laid more quickly than i had originally estimated mostly because i had completed all the preparation levelling the site earlier in the year. Here most of the slabs have been laid and some of the top soil removed and bagged up to create space. At this stage there were still two slabs to be laid, but first a section of grass and soil had to be removed.
The removal of the corner area of grass allowed the last corner post to be cast. The slabbed area created a useful work space for later work building the wooden structure.
|
After the first post base had been created the slabs, sand and wood was ordered and delivered. It is when these arrived that i realised how much more work had still to be done to complete the job.
The corner of the grass was removed and will be reused to create a new grass area at the rear of the scooter port. The soil was removed to create the area for the last two slabs. All of this soil was bagged together with much of the soil removed earlier and was quickly sold on-line to people who required good quality top soil for gardens etc. It was good to re-cycle the soil and recover some of the cost of the scooter port.
|