Progress on the driveway and scooter port has been good over the past month as the weather has been dry enough to allow plenty of work to be completed. The ground was levelled, top soil sold to create space and to recover some of the construction cost. The slabs were laid, and the wooden scooter port constructed and roofed. The only major out standing work to be completed is the gate and the electrics to allow the scooter to be charged. Click here to see the current progress.
0 Comments
I created the drinks table from a set of tables and chairs in the summer of 2015. Over the winter i cleaned and refurbished the table repairing small areas of damage and applying a new coat of varnish so it is now ready for a new season with hopefully lots of sun. Click here for more details. |
AuthorAllan Faulds is an Electronic Design Engineer who develops Hardware and Software on a professional basis. He has a strong interest in applying his design and development skills to his areas of interest such as bicycle lighting and plant growing and greenhouse and garden control technology. Archives
January 2024
Categories
All
|